News Flash

Street Projects

Posted on: July 6, 2019

07.06.19 Road Construction on 30th Ave from Waldron St to K61

Beginning Monday, July 8th, Cornejo will be moving traffic around as they pave the street. A minimum of one lane in each direction will remain open at all times during paving operations. Driveways may be temporarily blocked to allow paving operations to pass driveway location.

Facebook Twitter Email